Energy production

Senelec's grid

With the global energy crisis, Senegal—heavily dependent on fossil fuels—and SENELEC are facing significant increases in imported fuel costs. The waste-to-energy project in Touba, with its 10 MWe output, is expected to provide substantial savings for SENELEC and a positive impact on the state’s balance of payments.

For the Touba project, SENELEC has requested the project developers to conduct a final Integration Study for connecting the power plant to the local grid. They suggested wheeling of the power through a dedicated line directly to a new station currently under construction, located only 3.5 km from the Integrated Waste Recovery Center (CIVD).

Key figures

468 Billion FCFA

Revenue

39 Billion FCFA

Net Income

5167 GWh

Energy produced

656 Km

Transmission Network

A key partner

Slide In accordance with Law No. 98-29 of April 14, 1998, regarding the electricity sector, SENELEC has a monopoly on electricity transmission throughout the national territory. Its network is well developed, including in the municipalities of Mbacké and Touba.
Also, SENELEC boasts a strong financial position compared to other national operators in the region. They also want and encourage a better energy mix.